I got a problem with my SP Tables for characters above level 150. Once you reach level 151, the SP changes to 1 SP (or a super low value). Seems like the SP Table is broken. My renewal job_db looks fine. (see screenshot)
That's the same job_db.conf i am using or isn't it? I don't want to change it to custom values with the "tool".
Don't say me that the default Hercules job_db.conf SP Table (above 150) is broken and i have to change it with tools? Especially because it looks fine. (see my screenshot)
Edit: found the problem... It might be a bug: I disabled renewal aspd in renewal.h. Hercules is using the pre-renewal job_db.conf with HP/SP Tables max level 150 with this setting. Mysteriously the HP was fine.