How about drop Pre Renewal from Hercules ?

isn't possible to split them? ex. hercules-pre(final) and hercules-re(alpha)
Why not have in 1 if we can have it, making it easy for owner to switch between pre-re and renewal.
well my point is for those who wanna develop their re they can stay to alpha while pre-re lovers will stay to final
default_wink.png
separated files so no more argue?
Pre-RE servers likes system updates too. Why finalize it.

 
isn't possible to split them? ex. hercules-pre(final) and hercules-re(alpha)
Why not have in 1 if we can have it, making it easy for owner to switch between pre-re and renewal.
well my point is for those who wanna develop their re they can stay to alpha while pre-re lovers will stay to final
default_wink.png
separated files so no more argue?
Pre-RE servers likes system updates too. Why finalize it.
so why not separate the pre-re and merge the system updates when re is update. Is that impossible?

 
isn't possible to split them? ex. hercules-pre(final) and hercules-re(alpha)
Why not have in 1 if we can have it, making it easy for owner to switch between pre-re and renewal.
well my point is for those who wanna develop their re they can stay to alpha while pre-re lovers will stay to final
default_wink.png
separated files so no more argue?
Pre-RE servers likes system updates too. Why finalize it.
so why not separate the pre-re and merge the system updates when re is update. Is that impossible?
That will make dev to work double, to add code in pre-re and in re too. if there's only 1, both are updated.

 
Back
Top