Stein 0 Posted September 5, 2015 (edited) I got a problem with my SP Tables for characters above level 150. Once you reach level 151, the SP changes to 1 SP (or a super low value). Seems like the SP Table is broken. My renewal job_db looks fine. (see screenshot) I dont't know what's wrong with it. Edited September 5, 2015 by Stein Quote Share this post Link to post Share on other sites
0 evilpuncker 503 Posted September 6, 2015 read this, specially the "tools" part Quote Share this post Link to post Share on other sites
0 Stein 0 Posted September 6, 2015 (edited) read this, specially the "tools" part That's the same job_db.conf i am using or isn't it? I don't want to change it to custom values with the "tool". Don't say me that the default Hercules job_db.conf SP Table (above 150) is broken and i have to change it with tools? Especially because it looks fine. (see my screenshot) Edit: found the problem... It might be a bug: I disabled renewal aspd in renewal.h. Hercules is using the pre-renewal job_db.conf with HP/SP Tables max level 150 with this setting. Mysteriously the HP was fine. Edited September 6, 2015 by Stein Quote Share this post Link to post Share on other sites
I got a problem with my SP Tables for characters above level 150. Once you reach level 151, the SP changes to 1 SP (or a super low value). Seems like the SP Table is broken. My renewal job_db looks fine. (see screenshot)
I dont't know what's wrong with it.
Edited by Stein
Share this post
Link to post
Share on other sites